Cabral Gold Receives Operating License for the Cuiú Cuiú Phase I Gold Mine. Construction of ADR Leach Processing Plant Completed. First Gold Production Anticipated Ahead of Schedule

Cabral Gold
Vancouver, British Columbia–(Newsfile Corp. – August 13, 2026) – Cabral Gold Inc. (TSXV: CBR) (OTCQX: CBGZF) (“Cabral” or the “Company“) is pleased to provide an update on construction and commissioning activities at its Phase 1 gold-in-oxide heap leach project at the Cuiú Cuiú Gold District, Brazil. Highlights Construction...
Continue reading »

Goliath Intercepts Up To 10.32 g/t Au Over 6.00 Meters Within The New 320 Meter Expansion Area Of Golden Gate Zone To The Northeast, Remains Open, On High-Grade Gold Surebet Discovery, Golden Triangle, B.C.

Gold assay results have been intercepted in additional drill holes demonstrating continuity and predictability of the new 320 meter expansion area of the Golden Gate Zone to the Northeast (see news August 10, 2026). The Golden Gate Zone has been expanded by an aggregate of...
Continue reading »

Goliath Reports Up To 9.87 G/T Au Over 5.00 Meters, Confirms A 320 Meter Expansion Of Golden Gate Zone to The Northeast, Remains Open, On High-Grade Gold Surebet Discovery, Golden Triangle, B.C.

Assay results from multiple gold-rich drill intercepts from 2026 drilling have confirmed the expansion of the Golden Gate Zone to the northeast by 320 meters of the previously known gold mineralization; it remains open laterally and at depth (see Figures 1a and 1b). An accompanying...
Continue reading »