Magna Mining (NICU.V): Drill results from Shakespeare Project show encouraging results
Magna Mining CEO Jason Jessup joined Steve Darling from Proactive to share news the company has released the first two diamond drill holes that were designed to test a portion of the P-4 target which is located about 5 km to the east and on strike of the past-producing Shakespeare Mine.
Jessup telling Proactive this untested anomaly intersected significant nickel, copper, and Platinum Group Metals near surface. Magna looks to further test the down-dip extent of this zone of mineralization, as well as drill testing the second electro-magnetic anomaly.