Eloro Resources’ (ELO.V): Announces Launch of its Virtual Site Tour of the Iska Iska Silver-Tin Polymetallic Project in southern Bolivia on the VRIFY Technology Inc. (VRIFY) Platform

Eloro Resources
TORONTO, Aug. 09, 2022 (GLOBE NEWSWIRE) — Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce the launch of its Virtual Site Tour utilizing the VRIFY Technology Inc. (“VRIFY”) platform to showcase the Iska Iska silver-tin polymetallic project in...
Continue reading »

Eloro Resources’ (ELO.V): Deep Underground Hole DSBU-10 Intersects 188.64 g Ag eq/t (44.75 g Ag/t, 0.08 g Au/t, 1.05% Zn, 0.76% Pb and 0.14% Sn) over 349.08m in Core of Feeder Zone in the Santa Barbara Target Area at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Eloro Resources
Hole DSBU-10 drilled at azimuth 400 and a dip of -600, is the highest grade, longest intersection thus far at Iska Iska and includes the highest grade Ag to date of 44.75 g Ag/t over 349.08m. Notably, 59% of the overall length of this 878.9m long hole yielded reportable intersections which...
Continue reading »