District Metals CEO Garrett Ainsworth joined Steve Darling from Proactive to share news about their Phase 2 drill program underway at the Tomtebo Property in Sweden. So far, over 2000 metres has been completed in 6 holes.

Ainsworth telling Proactive, Hole TOM21-028 showed wide and high grade polymetallic mineralization intersected 30.4 m of continuous intense sulphide mineralization including 13.55 m of impregnation to semi-massive sulphides. The company is still running 2 drill rigs in this program.

Leave a Reply

Your email address will not be published. Required fields are marked *

Name *
Email *
Website