On January 23rd, 2025 Eloro Resources announced that it intersected 33 meters grading 1.39% tin within 87 meters grading 0.74% tin in its definition drilling program at its Iska Iska Deposit, Potosi Department, Bolivia. Tin mineralization is hosted in an extensive intrusion breccia unit (TIB) that is approximately 750m long by 450m wide and extends to a depth of at least 700m.

00:00 Intro 03:30 Drill rig on site continuing drilling into Tin Zone (west of Santa Barbara) 07:45 Objectives of latest phase of drilling at Iska Iska 12:30 Eloro share structure 15:40 Drill rig is stepping to the west 19:00 Pilot plant planning 23:30 Metallurgical testing 26:50 PEA in 2H 2025 29:10 Tin Talk 32:00 Small pilot plant idea and offtake arrangement 33:02 Thanks for watching!

Leave a Reply

Your email address will not be published. Required fields are marked *

Name *
Email *
Website