CLICK HERE to read the full news release!

Highlights:

The second diamond drill hole, TUDDH494, into “Tuvatu Deeps” is still in progress and currently at a depth of 700m
Results received for the first half of the hole drilled to date include:
1.47m @ 1.45 g/t Au from 157.15m from Murau 1 lode
3.60m @ 13.12 g/t Au from 188.80m from Murau 2 lode
Lion One to escalate the drilling program by moving to double shifting its own drill rig and review options for mobilising further drill rigs to the property

Leave a Reply

Your email address will not be published. Required fields are marked *

Name *
Email *
Website