First Phosphate Announces $2,000,000 Non-Brokered Private Placement and Filing of The Lac à l’Orignal Phosphate Project Technical Report

First Phosphate
Saguenay, Quebec–(Newsfile Corp. – November 28, 2022) – First Phosphate Corp. (“First Phosphate” or the “Company“) is pleased to announce that it intends to complete a non-brokered private placement for gross proceeds of up to $2,000,000 (the “Offering“) or such greater amount as the Corporation...
Continue reading »

NEVADA KING COMPLETES PHASE II DRILL PROGRAM AT LEWIS GOLD PROJECT- TESTS 4 HIGH PRIORITY TARGETS

Nevada King
VANCOUVER, BC, Nov. 30, 2022 /CNW/ –  Nevada King Gold Corp. (TSX-V: NKG) (OTCQX: NKGFF) (“Nevada King” or the “Company“) is pleased to announce the completion of its 2022 Phase II drilling program at its 5,500-hectare, 100% owned Lewis Gold Project (“Lewis Project” or “Project“), located approximately 21km south of Battle...
Continue reading »

Goliath Intersects 117.21 G/T AuEq (115.00 G/T Au & 6.32 G/T Ag) Over 1 Meter* Within 24.64 G/T AuEq (23.17 G/T Au & 6.32 G/T Ag) Over 5.00 Meters* in Second Batch of Surebet Zone’s Drill Results Confirming a 97% Hit Rate of Significant Gold Mineralization Within Its 1.6 Sqkm Area

Goliath Intersects 117.21 G/T AuEq (115.00 G/T Au & 6.32 G/T Ag) Over 1 Meter* Within 24.64 G/T AuEq (23.17 G/T Au & 6.32 G/T Ag) Over 5.00 Meters* in Second Batch of Surebet Zone’s Drill Results Confirming a 97% Hit Rate of Significant Gold...
Continue reading »

Dolly Varden Silver (DV.V): Intersects 27.44 g/t Au and 463 g/t Ag over 9.16m, Including 75.13 g/t Au and 2,337 g/t Ag over 1.77m at Homestake Ridge

Vancouver, British Columbia–(Newsfile Corp. – November 29, 2022) – Dolly Varden Silver Corporation (TSXV: DV) (OTCQX: DOLLF) (the “Company” or “Dolly Varden“) is pleased to announce drill results from the 100%-owned Homestake Ridge property in BC’s Golden Triangle. The objective of drilling during 2022 at...
Continue reading »

Eloro Resources Intersects Multiple Intersections including 122.25g Ag eq/t (17.77g Ag/t, 0.30% Zn, 0.33% Pb, 0.10% Cu and 0.16% Sn) over 210.74m in High Grade Feeder Zone, Santa Barbara Target Area at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Eloro Resources
The headline intersection in hole METSBUG-03 drilled from the Santa Barbara adit, includes higher-grade portions of: 272.90g Ag eq/t (100.21g Ag/t, 0.37% Pb, 0.17% Cu and 0.34% Sn) over 16.57m. 199.68g Ag eq/t (51.11g Ag/t and 0.34% Sn) over 13.11m. 64% of this 707.8m long drill hole contains reportable intersections...
Continue reading »