VANCOUVER, BCOct. 25, 2021 /CNW/ – Rokmaster Resources Corp. (TSXV: RKR) (OTCQB: RKMSF) (FSE: 1RR1) (“Rokmaster” or the “Company“) is pleased to announce that it has successfully concluded its 2021 surface diamond drill program (for detail see news releases, June 17, 2021June 24, 2021, and August 24, 2021) for the season at its Revel Ridge Project with 10,747 metres cored in 39 holes.

Underground diamond drilling (fully permitted until August 2022) will resume on November 8, 2021. The drilling is being conducted under contract by Hy-Tech Drilling Ltd. of Smithers, B.C., under the supervision of Dr. James “Jim” Oliver, P. Geo.

The focus of the next stage of drilling will recover larger HQ size drill core from existing underground workings to obtain additional metallurgical samples from depth, while continuing to expand the Main, Hanging and Footwall Zones.

Work on updating the current NI 43-101 resource at Revel Ridge is continuing and surface assays are pending.

Corporate presentations, figures and photos are available on Rokmaster’s website at https://www.rokmaster.com/projects/revel-ridge/

On behalf of the Board of Directors,

“John Mirko”

John Mirko, President and Chief Executive Officer.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

CAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS:
This news release may contain forward-looking information within the meaning of applicable securities laws (“forward-looking statements”). Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects,” “plans,” “anticipates,” “believes,” “intends,” “estimates,” ‘projects,” “potential” and similar expressions, or that events or conditions “will,” “would,” “may,” “could” or “should” occur. These forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metal prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the Company’s properties; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in the work program; the risk of environmental contamination or damage resulting from Rokmaster’s operations and other risks and uncertainties. Any forward-looking statement speaks only as of the date it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise.

SOURCE Rokmaster Resources Corp.

For further information: Mr. John Mirko, CEO of Rokmaster Resources, [email protected], Ph. 1-604-290-4647. For shareholder information please contact: Mike Kordysz, [email protected], Ph. 604-319-3171

Related Links

https://www.rokmaster.com/

Leave a Reply

Your email address will not be published. Required fields are marked *

Name *
Email *
Website