Goliath (GOT.V): Adds Second Drill Based on Extensive Mineralization Observed From First 5 Holes, Drilling Is Now Underway at Sixth Hole (GD21-006) ~600 Meters Along Strike at the North Showing Surebet, Golden Triangle B.C.

All five drill holes completed to date have intersected significant widths of veining and sulphides demonstrating the robust nature of this mineralized system at the Surebet Polymetallic Gold-Silver Zone. Rush assays are expected in the immediate future for GD21-001. A second drill has been added...
Continue reading »

Prosper Gold (PGX.V): Extends Gold-in-Till Anomaly at Golden Corridor to 7.0 km Golden Sidewalk Project – Red Lake, Ontario

VANCOUVER, British Columbia, Aug. 03, 2021 (GLOBE NEWSWIRE) — Prosper Gold Corp. (“Prosper Gold” or the “Company“) (TSXV:PGX) is pleased to provide an exploration update on till sampling and diamond drilling activities from the 2021 exploration program at the Golden Sidewalk Project (the “Project”) in...
Continue reading »

Juggernaut (JUGR.V): Commences Drilling of Two Extensive High-Grade Gold-Silver Targets in Northwest B.C.

Juggernaut
VANCOUVER, British Columbia, Aug. 03, 2021 (GLOBE NEWSWIRE) — Juggernaut Exploration Ltd. (TSX-V: JUGR) (OTCQB: JUGRF) (FSE: 4JE) (the “Company” or “Juggernaut”) is pleased to report it has commenced inaugural diamond drill programs at each of its 100% controlled GoldStandard and Goldstar projects. Drilling is designed to...
Continue reading »